PROJECT HISTORY FOR GAS MONITORING, EXTRACTION AND DRAINAGE SYSTEMS

PROJECT HISTORY FOR GAS MONITORING, EXTRACTION & DRAINAGE SYSTEMS

 

2012

GAS EXTRACTOON PLANT  –  

XSTRATA Coal, Ravensworth Underground Mine

Design, installation and commissioning of a turnkey solution Goaf Drainage Pumping System (GSPS) including two 250 kW VVF Ring Pumps and three 1000 l/s Flare Arrangements

2011

GAS EXTRACTION PLANT  –  

BHP Bilton, Appin Coal Area 7

Design, installation and commissioning of additional Liquid Ring Pump

2010

GAS EXTRACTION PLANT  –  

XSTRATA Coal, Blakefield South Coal Mine

Design, installation and commissioning of a Goaf Drainage Plant Electrics/PLC System (GDPS) including the design and installation of six remote wellheads for control of gas flow to the pump station and switch room for four 1000 V/500 kW Motor Starter Cubicle

2009

GAS EXTRACTION PLANT  –  

BHP Bilton, Appin Coal Area 7

Design, installation and commissioning of a turnkey solution Goaf Drainage Pumping System (GDPS) including the design and installation of three remote wellheads for control of gas flow to the pump station

2008

GAS EXTRACTION PLANT  –  

XSTRATA Coal, United Collieries, Hunter Valley

Design, installation and commissioning of a Goaf Drainage Plant Electrics/PLC System (GDPS) using a Cummings Natural Gas engine with a hydraulic driven blower arrangement

1995

GAS EXTRACTION PLANT  –  

Oakdale Colliery, Wollondilly

Design, installation and commissioning of a turnkey solution Goaf Drainage Pumping System (GDPS) including a remote site UHF Telemetry System